OPERATOR: 

Aker Energy Ghana Limited – 50% interest in block

OTHER CONTRACTING PARTIES:

  1. Lukoil Overseas Ghana Limited – 38% interest in block

  2. FT Exploration and Production Limited – 2% interest in block

  3. Ghana National Petroleum Corporation (GNPC) – 10% interest in block

Contract Area Size: 2,100 sq.km

Effective Date: July 19, 2006

Exploration Period: 7 years     

Current Phase of Operations: Pre-Development

Extension(s): Ten (10) months post ITLOS ruling to submit Plan of Development (PoD).

Status of Operations

Contractor has completed appraisal and declared commerciality for Pecan, Almond and Beech oil discoveries. A conceptual development plan has been agreed on for reserves. The Contractor is currently undertaking FEED for subsea and FPSO development. The Contractor is yet to submit a formal PoD. The Contractor has raised certain issues in respect of the appraisal of the gas and gas condensate discoveries which are Hickory North and Paradise.

About 69% of the Contract Area was affected by the ITLOS ruling. The then Minister for Petroleum in June 2016 granted Contractor ten (10) months post the maritime boundary ruling to submit a Plan of Development for the commercial fields.

The Contractor has undertaken the required work on the oil discoveries and is at the advanced stage of pre-development. The operator is expected the submit a Plan of Development within ten (10) months after the ITLOS ruling.

Withholding Tax: Withholding tax at a rate of five (5%) from the agreement amount due to any Subcontractor if and when required by Section 27(1) of the Petroleum Income Tax Law.

Surface Rental

Additional Oil Entitlement: Refer to the Petroleum Agreement.

FISCAL TERMS

Royalty: Four percent (4%) of the Gross Production of Crude Oil shall be delivered to the State as Royalty.

Royalty to be delivered to the State on Natural Gas shall be at the rate of three percent (3%) of the annual Gross Production of Natural Gas. 

Income Tax: In accordance with the provisions of the Income Tax law, petroleum income tax shall be levied at thirty five percent (35%).

DEEPWATER TANO CAPE THREE POINT

wdt_ID NAME OF CONTRACTOR PARTY TYPE OF PERMIT PURPOSE OF PERMIT PERMIT NUMBER PERMIT START DATE PERMIT END DATE
1 Hess Ghana Exploration Limited Registration Permit Permit to undertake Exploration PC/000078/A/0513 13-May-13 12-May-14
2 Hess Ghana Exploration Limited Registration Permit Permit to undertake Exploration PC/000127/A/0514R 13-May-14 12-May-15
3 Hess Ghana Exploration Limited Exploration and Development Permit Permit to undertake Exploration PC/012/E&P/0515R 13-May-15 12-May-16
4 Hess Ghana Exploration Limited Exploration and Development Permit Permit to undertake Exploration PC/024/E&P/0516R 13-May-16 12-May-17
5 Hess Ghana Exploration Limited Exploration and Development Permit Permit to undertake Exploration PC/036/E&P/0517R May 13, 2017 May 12, 2018
6 Hess Ghana Exploration Limited Contractor Party to Petroleum Agreement As a Contractor Party to Petroleum Agreement in respect of Deepwater Tano Cape Three Points Block PC/CPA/00000225/0518R May 13, 2018 May 12, 2019
7 Aker Energy Ghana Limited Exploration and Development Permit As Operator in respect of Deepwater Cape Three Points Block PC/EDP/0000029/0520R May 13, 2020 May 12, 2021
8 Aker Energy Ghana Limited Contractor Party to Petroleum Agreement As a Contractor Party to Petroleum Agreement in respect of Deepwater Tano Cape Three Points Block PC/CPA/0000068/0520R May 13, 2020 May 12, 2021
9 Aker Energy Ghana Limited Exploration and Development Permit As Operator in respect of Deepwater Cape Three Points Block PC/EDP/0000032/0521R May 13, 2021 May 12, 2022
10 Aker Energy Ghana Limited Contractor Party to Petroleum Agreement As a Contractor Party to Petroleum Agreement in respect of Deepwater Tano Cape Three Points Block PC/CPA/0000090/0521R May 13, 2021 May 12, 2022
NAME OF CONTRACTOR PARTY TYPE OF PERMIT PURPOSE OF PERMIT PERMIT NUMBER PERMIT START DATE PERMIT END DATE